Many jobs going on today all at once. While waiting on the roof trusses to arrive the framers assembled some of the stairs. The roof trusses arrived on City Lumber's big truck which dropped them off with ease. These trusses will be lifted up to the roof tomorrow with a piece of equipment called a sky-lift.
A workman came by this morning to build the five front porch metal supports. He did a very neat job. Steve, our builder will install the supports before next Tuesday when the cement is scheduled to be poured onto the top balcony floor.
1 comment:
This blog is great. I am in the habit of checking in every night, and look forward to seeing another day of progress. Today was specially good.
Post a Comment