The insulation work has been rescheduled for Monday. The builder wants to make sure the interior is completely dry before the insulation is installed.
Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts
Wednesday, September 12, 2007
All Work Continues
Saturday, August 4, 2007
Trane Heating and Air Conditioning
The builder Steve Gaines swepted up all the floors in the house Thursday and Friday. He is very neat. He always keeps the outside perimeter cleaned up too. He said he dosen't do house work, but does keep a neat work area. Steve said the electrician should be out this next week to start on the wiring.
The plumbers did a very neat job insulating all the hot water lines through out the house. Their work is complete for a while. 
Tuesday, July 31, 2007
Framing and Plumbing
The fireplace base was also added today. Elizabeth enjoyed the base as a chair while working on her website. This fireplace is in the living room is an Inglenook wood burning stove. This stove will keep us toasty next winter.
The plumbers brought in the gas line to the upstairs utility room this afternoon. Yesterday they completed insulating all the hot water lines.
Steve brought all the outside doors to the house from storage this morning. They are all ready to go in when the framers can get to them.
Wednesday, July 25, 2007
Plumbers
Our hot water system is a continuous system which requires a lot of tubing. This means when I turn on a hot water faucet anywhere in the house I will instantly have hot water. Great feature.
Monday, July 23, 2007
Busy Men
Frank and his men are building the chimney from the study today.
The plumber is taking the plumbing pipe upstairs, he has completed the downstairs. I like all this busyness.
Saturday, July 21, 2007
Slow and Steady
The plumber delivered the whirlpool tub. This tub is pretty big. They will install it under the bathroom windows some time later. Paul is looking forward to a long soak in the tub while enjoying the view out the window.
Elizabeth displays the attic ventilation Steve Gains brought to the job site this week.
Thursday, July 19, 2007
Windows-Plumbing
The plumbers started their installation today. They will continue working at the house through next week. Things are moving right along now. Yeehaw.