With our delay due to the rain it was a welcome sight to see all the different crews back to work today. The plumbers were connecting the gas line to the fireplace in the study, the electrician was back running more cable, and the roofers picked up where they left before the rain.
The insulation work has been rescheduled for Monday. The builder wants to make sure the interior is completely dry before the insulation is installed.
No comments:
Post a Comment