We chose Trane for our heating and air conditioner units. The installers brought the heater last week. The space for the heater is above the garage right next to the dormers. The installer will be back Monday. He will continue to install all the duct work next week. The rest of the unit will be placed in the third floor attic.
The builder Steve Gaines swepted up all the floors in the house Thursday and Friday. He is very neat. He always keeps the outside perimeter cleaned up too. He said he dosen't do house work, but does keep a neat work area. Steve said the electrician should be out this next week to start on the wiring.
The plumbers did a very neat job insulating all the hot water lines through out the house. Their work is complete for a while.
1 comment:
Looks like the plumbers didn't put plates over some of the plumbing under the windows.These stop the sheet rock people from driving nails in the pipes.They may have installed them after the pix.I have driven nails through the plumbing before and it is not fun to repair.
Love You
Uncle Ray