Friday, December 28, 2007

Floors Covered



Steve worked much of the holiday week on the stair case trim, it won't be long before he is finished with the railing.
After the wood floors are installed Steve started rolling out corrugated paper to protect them. We still have a lot of workmen coming in and out and this should be a great help to protect the surface of the floors.
The plumbers were first at the job site this morning. They installed the hot water heater, utility sink and reverse osmosis purifier today.
The last piece of granite was installed around the jacuzzi. Little by little each job is completed.
My photos are out of order tonight there seems to be a little glitch with Blog Spot. I will try again tomorrow to revise their order. For now, thank you for looking in on us. Goodnight.